Repair & maintenance

Industrial generator repair: find what failed, then get quotes

Send your generator's nameplate details and symptoms once, and we'll review the request and share it with up to three independent providers that serve your ZIP code and list industrial generator repair: diesel and natural gas sets, transfer switches, starting batteries, fuel systems and controls. It's free for facilities, and providers may pay us a referral fee. If life-safety or critical loads are unprotected right now, arrange temporary power while the repair is scoped.

Updated · How we research

What to do when the generator is down

Protect the loads first, then collect what a technician needs to diagnose the fault.

  1. Protect critical loads. If the generator backs up life-safety, healthcare or process loads, ask about rental generators and temporary distribution while the unit is out of service. For a fire or injury, call 911.
  2. Record the controller display. Photograph the alarm or shutdown code, engine hours and any fault history. Cummins advises investigating shutdown alarms and fuel, oil or coolant leaks promptly rather than waiting for the next visit1.
  3. Note what the transfer switch did. A generator that starts but doesn't power the building may have a transfer switch problem, not an engine problem1.
  4. Pull the maintenance file. Last service date, last load test, last fuel test and recent outage or exercise logs.
  5. Plan the return-to-service test. See the post-repair test below.

If the unit is down now

If you already have a service agreement or a dealer for this unit, call them first. Use the form on this page when you want competing quotes or a second provider, and choose "Urgent: equipment is down now" as your timeline. Providers set their own response times, and we don't promise one, so ask each provider for its emergency response commitment in writing (see the questions to ask below). Ask too whether the parts are in stock or on order, because that affects how long the unit stays out of service.

Why generators fail to start, transfer or carry load

Cummins says most generator set failures don't begin with a major mechanical breakdown but with small issues that go unnoticed1. In a November 2026 article drawn from its field technicians, Cummins names missed maintenance, aging batteries, contaminated fuel, deteriorating electrical components, cooling-system problems, rodent damage and transfer switch failures as common causes1. A generator can sit for months, and during that time batteries lose capacity, fuel changes, connections corrode and hoses keep aging even though the engine never runs1.

Batteries come up in almost every list. An NFPA technical services engineer's overview of NFPA 110 calls battery failure the most common cause of generator failure2. Cummins links aging or weak batteries to failure to start but doesn't rank the risk areas against each other1. Neither source publishes a failure-rate breakdown, so treat batteries as a first check, not a foregone conclusion.

Generator symptoms matched to the system Cummins links them to, summarized from Cummins field technician findings (Cummins, November 4, 2026), with the wet stacking row from Kohler Power Systems (now Rehlko) and the checks to ask a provider for
SymptomSystem it points toWhat technicians commonly findAsk the provider to check
Fails to startStarting batteriesAging or weak batteries1Battery test results, charger output, cable condition
Fuel system problemsFuel systemContaminated fuel, water intrusion, restricted filters1Fuel sample, filters, water at the tank bottom
Overheating or shutdownsCooling systemWorn hoses, coolant leaks1Hoses, coolant level and condition, block heater
Unreliable operationElectrical components and controlsCorroded connections, control board issues1Controller fault history, terminations, sensors
Generator runs, but power fails to transferAutomatic transfer switchControl board or microswitch failures1ATS controller, contacts, a full transfer and retransfer
Lost performance after long running at light load (diesel)Exhaust and engine (wet stacking)Unburned fuel buildup in the exhaust system4Load history, injectors, whether a load bank run is needed
Wiring, sensor or generator-end faultsEngine and generator end, enclosureDust, debris, moisture; rodent damage to wiring and sensors1Field or shop repair, insulation test results, parts lead time

Sources: Cummins1; wet stacking row, Kohler4. The symptom column rewords Cummins' impact column. The right-hand column is our suggested question list, not part of either source.

Rodent damage can be worse than it sounds. Cummins says technicians have seen wiring and sensor damage severe enough to need major generator-end repairs1. Prime-power units that run a plant are covered too, though NFPA 110 may not apply to them (see the limits near the end of this guide).

Transfer switch faults that look like generator faults

If the generator starts and runs but the building stays dark, look at the automatic transfer switch (ATS). The ATS senses the utility outage and moves the load to the generator. Cummins notes that a faulty ATS can leave a running generator delivering no power to the facility. It lists failed control boards, microswitches and weather damage, and one technician noted that deteriorated ATS membranes can let rainwater into the enclosure1.

NFPA staff describe transfer switch maintenance as checking connections, looking for signs of overheating, removing dust and dirt, replacing contacts where needed and verifying the controls, plus a monthly test that electrically operates the switch from normal to alternate and back3. When the ATS sits in switchgear or needs infrared scans and contact resistance testing, your generator provider may bring in an electrical testing firm. Ask who does what before work starts.

Wet stacking: what light-load running does to a diesel engine

Wet stacking is unburned fuel building up in a diesel engine's exhaust system, and it comes from running with little or no load. Kohler Power Systems (now Rehlko) explains that below about 30% of capacity for long periods, the engine can't reach the temperatures needed to burn fuel completely. Over time it fouls injectors, wears valve guides and can damage pistons, liners and rings4. NFPA staff give the same warning: generator sets shouldn't be left idling, because wet stacking can develop when diesel units run without load3.

The fix is load. Kohler notes that many operators don't want to transfer to building load for the monthly exercise, so those sites need a load bank for it4. Your service company can bring one, or you can rent a load bank if your own staff runs the exercise. Some manufacturers, Kohler among them, say certain newer diesel engines can be exercised unloaded, but NFPA 110's monthly criterion (30 minutes at 30% of rated load or at the manufacturer's minimum exhaust temperature) still applies, so follow your engine documentation and confirm with your AHJ whether unloaded exercise meets it for your unit4.

Fuel testing and stored diesel

NFPA 110 requires a fuel quality test at least once a year3. In the 2019 edition the wording is a test "using appropriate ASTM standards" (section 8.3.7; 8.3.8 in the 2010 edition), according to a fuel-treatment company that quotes the requirement5. The same source cites section 7.9.1.3: tanks are sized so fuel is used within its storage life, or the owner has to remediate or replace stale or contaminated fuel5. Cummins technicians recommend fuel testing as routine maintenance, say testing has shown some customers that fuel polishing was needed before a bigger problem developed, and suggest not leaving diesel tanks partly full for long periods because condensation adds water1.

Diesel shelf-life figures on service company websites vary widely, and we found no primary source for them, so we don't repeat them. Your tank's test result is the number that matters. If a fault traces back to fuel, ask whether the provider tests, polishes and cleans tanks or subcontracts it.

OEM dealer or independent service company

Lean toward the OEM dealer when warranty, factory parts or brand-specific controller software matter most, and toward an independent when you want one contract covering several brands, or generators and transfer switches together. Generator manufacturers mostly provide service through authorized networks:

  • Caterpillar sends owners to their Cat dealer for troubleshooting, service and repair7.
  • Rehlko (formerly Kohler Energy) lists genuine parts, preventative maintenance, warranties, training and technical support in its aftermarket offering8.
  • Generac Industrial Energy runs a dealer locator for sales, installation, maintenance and service9.
  • Cummins says its Sales and Service network services all makes and models, using factory-trained technicians and current diagnostic tools6.

We have no agreement with Cummins, Caterpillar, Rehlko or Generac. They're named as public sources for how their service networks work, not because they're in our referral network, and naming them isn't an endorsement.

Independent service companies often advertise multi-brand service across a region, which can help if you run a mixed fleet. Whatever they advertise, ask about your specific engine, alternator and controller. Parts and software for older controllers and engines may be harder to source, so ask.

Check your warranty before you hire anyone. Generac, for example, warns on a residential support page that failures caused by improper or lack of maintenance may compromise the warranty10; industrial warranty terms may differ. If the unit is under factory or extended warranty, ask the manufacturer who may work on it and what records they need.

Technician credentials worth asking about

The Electrical Generating Systems Association (EGSA) certifies generator technicians at two levels11:

  • Apprentice: for students and technicians in roughly their first two years. The exam covers more than 40 knowledge areas, and certification is valid for three years.
  • Journeyman: for technicians with at least three years of field experience. It covers 61 areas, including diagnostics and controls, and is valid for five years.

EGSA also lists a separate load bank certification11. Factory training from the engine or generator manufacturer is the other credential to ask about. NFPA staff describe the requirement as a qualified person with the skills, knowledge and safety training for the equipment, without naming a specific credential3.

Questions to ask before you hire

  • Are you authorized by the manufacturer of this engine and controller, or independent? Can you get parts and controller software for this model?
  • Which technicians would come, and what EGSA or factory certifications do they hold?
  • Do you handle the transfer switch, load bank and fuel work yourselves, or subcontract them?
  • What response commitment will you put in writing for an emergency call at this site?
  • Are the parts this repair is likely to need in stock or on order?
  • Will the service report document the NFPA 110 return-to-service test in a form my AHJ accepts?
  • Can you provide a rental generator if the repair runs long?

The post-repair test and service records

A repair isn't finished until the system passes its return-to-service test and the work is recorded3. For emergency and standby systems covered by NFPA 110, NFPA staff say Chapter 8 calls for a 30-minute operational test each time the system goes back into service after maintenance or repair, and for records of all inspections, tests, exercising, repairs and modifications3. The work must be done by a qualified person following the manufacturer's instructions and any AHJ requirements3. Section numbers and some requirements changed between editions, so confirm against the edition your AHJ enforces5. For the weekly, monthly, annual and 36-month schedule, see what NFPA 110 requires at each test interval.

The repair is not finished until the test is logged

Ask the provider to include the 30-minute operational test, the readings they recorded and a written service report in the quote. NFPA staff say records must be kept of all inspections, tests, exercising and repairs3. That record, not the invoice, is your proof the repair was tested.

Emergency repair, a maintenance agreement, or replacement

A one-time repair fixes today's fault. A planned maintenance agreement is meant to catch the next one before an outage does. Cummins technicians say deferred maintenance gives small problems more time to grow, and that many outage failures could have been caught on a routine inspection months earlier1.

As one example of what a manufacturer's agreement can include, Cummins lists full inspection, oil and filter changes, load bank performance testing, transfer switch inspection, fluid analysis, cooling system maintenance, emergency service and customized plans6. Cummins says its PowerCare agreements bundle service with technical support and remote monitoring12.

When you compare agreements, line them up against what NFPA 110 requires at each test interval:

  • Which weekly and monthly tasks stay with your staff, and which the provider does
  • Whether load bank testing, fuel testing and transfer switch service are included or extra
  • How emergency calls are prioritized and billed for contract customers
  • Parts pricing, and whether after-hours labor is priced differently
  • What the written report contains, and how fast you get it

Repair or replace

Age alone doesn't decide it. A Cummins field technician reports seeing generator sets more than 40 years old in excellent condition because owners kept up maintenance, and units only a few years old fail when it was neglected1. The practical questions are whether parts and controller support are still available, whether the set still matches your load, and whether emissions permits or aftertreatment rules limit how you can run it. Kohler notes that regional air rules can dictate exercising requirements for units with aftertreatment4.

What drives the cost of generator repair

Repair cost depends mostly on where the fault is, whether parts are available, when the work happens and the testing needed afterward. We don't publish dollar figures because we found no credible source for them. Ask about each of these so you can compare quotes line by line:

  • Diagnosis: trip charge, diagnostic time and whether it's credited against the repair
  • Where the fault is: batteries and charger, fuel system, cooling system, controls, transfer switch, engine or generator end
  • Parts: OEM or aftermarket, in stock or on order, and freight
  • Labor timing: business hours, nights, weekends or holidays
  • Site work: rooftop or indoor access, cranes or rigging, confined spaces
  • Testing after repair: the NFPA 110 return-to-service test, plus a load bank if building load can't support it
  • Extras: fuel polishing or tank cleaning, a rental generator, cable and temporary distribution

What to send for an accurate repair quote

The more of this you send up front, the fewer calls it takes before someone gives you a firm number or a site visit.

  • Nameplate: generator make, model, serial number, kW or kVA rating, voltage and phase; engine make and model; fuel type (diesel, natural gas or other)
  • Use: standby or prime power; NFPA 110 Level and Class if you know them; what it backs up (life safety, fire pump, healthcare, data, process)
  • Symptom: won't crank, cranks but won't start, starts then shuts down, won't transfer, won't carry load, leaks, smoke or noise
  • Controller: make and model, a photo of the alarm or shutdown code, and engine hours
  • Transfer switches: make, amperage and how many
  • History: last service, last load bank test, last fuel test, recent outages or failed exercises
  • Fuel: tank size and location, and when fuel was last delivered or polished
  • Site: indoor, outdoor enclosure or rooftop; access hours; security or badging rules
  • Extras: whether you need temporary power or a load bank, and whether you also want a maintenance agreement priced

Once you have those details, request quotes with the form on this page.

Limits of this guide

This is general information, not engineering advice or a diagnosis of your unit. The NFPA 110 requirements above are drawn from NFPA staff articles, a vendor summary and Cummins webinar slides that quote the standard, not from the standard's full text. Requirements differ by edition. Section numbers here come from the 2019 and 2010 editions. We couldn't review the 2025 edition, and section numbers and wording may differ in it. Your AHJ, insurer or accrediting body decides which edition applies and may require more. NFPA 110 covers emergency and standby systems, so a prime-power unit running a plant may follow its manufacturer's schedule and other rules instead. Fuel guidance here is about stored liquid fuel. Failure causes come from Cummins, Kohler and NFPA staff; we found no neutral published failure-rate data. Manufacturer statements are their own claims.

Get quotes through Critical Power Index

Send one request with your generator details, site ZIP code and timeline. We review each request and share it with up to three independent providers that serve your ZIP code and list generator repair. They contact you directly with questions, a site visit or a quote, and you decide whether to hire anyone. Providers set their own response times; we don't promise one. It's free for facilities. Providers may pay us a referral fee, which is explained in our referral disclosure. Critical Power Index is a referral service, not a generator dealer or contractor, and we don't perform or supervise repairs. More detail is on how it works.

Sources

  1. Why standby generators fail: common causes and how to prevent them, Cummins Inc., November 4, 2026. Manufacturer article based on its field technicians’ findings. Checked 2026-11-26.
  2. An Overview of NFPA 110, NFPA (Brian O’Connor, technical services engineer), January 23, 2023. NFPA blog; states it reflects the author’s opinion, not an official NFPA position. Checked 2026-11-26.
  3. Maintaining Your Emergency Power Supply System is Critical, Particularly During Hurricane Season, NFPA (Shawn Mahoney, technical services engineer), June 14, 2024. NFPA blog summary of NFPA 110 Chapter 8; edition not stated. Checked 2026-11-26.
  4. Diesel Generator Maintenance: Feasibility and benefits of no-load exercising, Kohler Power Systems (now Rehlko), Justin Loritz. Manufacturer white paper. Checked 2026-11-26.
  5. What NFPA 110 Requires for Stored Generator Fuel, Bell Performance (Erik Bjornstad), August 25, 2026. Fuel-treatment company; quotes NFPA 110 (2019 edition) text and credits its section table to a Curtis Power Solutions summary. Checked 2026-11-26.
  6. Protect your power with planned generator maintenance, Cummins Inc.. Checked 2026-11-26.
  7. Electric power product support, Caterpillar. Checked 2026-11-26.
  8. Parts and service, Rehlko Power Systems. Checked 2026-11-26.
  9. Industrial dealer locator, Generac Industrial Energy. Checked 2026-11-26.
  10. How can I find a Generac service dealer in my area?, Generac. Residential support article; warranty terms for industrial units may differ. Checked 2026-11-26.
  11. EGSA Technician Certifications, Electrical Generating Systems Association. Checked 2026-11-26.
  12. PowerCare service agreements, Cummins Inc.. Checked 2026-11-26.
  13. NFPA 110 Testing and Service Requirements for Standby Power Systems (webinar slides), Cummins Inc., December 15, 2020. Quotes NFPA 110 (2016 edition) sections 8.4.2, 8.4.2.3 and 8.4.9. Checked 2026-11-26.
Request quotes